Products

Search by features


ВБШвнг(А) (VBShvng(A))

ВБШвнг(А) (VBShvng(A))
Price on request
₽0
By category
Force cables
Voltage
660 / 1000 / 3000
In execution
Flame retardant (-ng(А)) / Armored
Insulation
Copper
Shell
PVC insulation
Core material
Flexible PVC
Number and nom, cross-section of CCC and screens, nxmm2, external diameter, mm, weight of 1km of cable, kg
VBShvng(A)
Number of conductors, nominal cross-section (mm2), construction, voltage (kV) Calculated diameter of cable, mm Calculated weight of cable, kg/km
2х1,5ок(N)-0,66 12,3 265
2х2,5ок(N)-0,66 13,1 305
2х4ок(N)-0,66 14,4 380
2х6ок(N)-0,66 15,4 449
2х10ок(N)-0,66 18 620
2х16ок(N)-0,66 19,8 794
2х25ок(N)-0,66 22,9 1097
2х35ок(N)-0,66 25,4 1394
2х50ок(N)-0,66 28,4 1769
3х1,5ок(N,PE)-0,66 12,7 288
3х2,5ок(N,PE)-0,66 13,5 338
3х4ок(N,PE)-0,66 15 428
3х6ок(N,PE)-0,66 16 517
3х10ок(N,PE)-0,66 18,8 728
3х16ок(N,PE)-0,66 20,7 954
3х25ок(N,PE)-0,66 24,5 1367
3х35ок(N,PE)-0,66 26,8 1726
3х50ок(N,PE)-0,66 29,9 2211
4х1,5ок(N)-0,66 12,3 324
4х2,5ок(N)-0,66 13,1 387
4х4ок(N)-0,66 14,4 497
4х6ок(N)-0,66 15,4 604
4х10ок(N)-0,66 18 869
4х16ок(N)-0,66 19,8 1156
4х25ок(N)-0,66 22,9 1687
4х35ок(N)-0,66 25,4 2130
4х50ок(N)-0,66 28,4 2744
5х1,5ок(N,PE)-0,66 14,2 365
5х2,5ок(N,PE)-0,66 15,2 442
5х4ок(N,PE)-0,66 17 574
5х6ок(N,PE)-0,66 18,5 710
5х10ок(N,PE)-0,66 21,8 1021
5х16ок(N,PE)-0,66 24,6 1394
5х25ок(N,PE)-0,66 29 2015
5х35ок(N,PE)-0,66 31,6 2565
5х50ок(N,PE)-0,66 36,2 3416
5х35мс(N,PE)-0,66 30,3 2341
5х50мс(N,PE)-0,66 34,9 3187
2х1,5ок(N)-1 13,1 292
2х2,5ок(N)-1 13,9 335
2х4ок(N)-1 15,6 431
2х6ок(N)-1 16,6 500
2х10ок(N)-1 18,4 640
2х16ок(N)-1 20,2 814
2х25ок(N)-1 23,3 1121
2х35ок(N)-1 25,8 1421
2х50ок(N)-1 28,8 1796
3х1,5ок(N,PE)-1 13,6 320
3х2,5ок(N,PE)-1 14,4 374
3х4ок(N,PE)-1 16,3 485
3х6ок(N,PE)-1 17,5 579
3х10ок(N,PE)-1 19,2 749
3х16ок(N,PE)-1 21,2 978
3х25ок(N,PE)-1 24,9 1396
VBShvng(A)
Number of conductors, nominal cross-section (mm2), construction, voltage (kV) Calculated diameter of cable, mm Calculated weight of cable, kg/km
3х35ок(N,PE)-1 27,2 1755
3х50ок(N,PE)-1 30,3 2244
4х1,5ок(N)-1 14,4 360
4х2,5ок(N)-1 15,3 425
4х4ок(N)-1 17,6 563
4х6ок(N)-1 18,8 679
4х10ок(N)-1 20,7 894
4х16ок(N)-1 22,9 1182
4х25ок(N)-1 27,2 1719
4х35ок(N)-1 29,5 2164
4х50ок(N)-1 33,1 2779
5х1,5ок(N,PE)-1 15,3 407
5х2,5ок(N,PE)-1 16,3 486
5х4ок(N,PE)-1 18,8 651
5х6ок(N,PE)-1 20,2 789
5х10ок(N,PE)-1 22,3 1054
5х16ок(N,PE)-1 25,2 1428
5х25ок(N,PE)-1 29,5 2054
5х35ок(N,PE)-1 32,2 2604
5х50ок(N,PE)-1 36,7 3399
5х35мс(N,PE)-1 30,8 2375
5х50мс(N,PE)-1 35,4 3230
1х70мк-1 19,9 1040
1х95мк-1 21,9 1337
1х120мк-1 23,3 1588
1х150мк-1 26,1 1935
1х185мк-1 28,5 2339
VBShvng(A)
Number of conductors, nominal cross-section (mm2), construction, voltage (kV) Calculated diameter of cable, mm Calculated weight of cable, kg/km
1х240мк-1 31,2 2931
1х300мк-1 34,9 3658
1х400мк-1 38,2 4530
2х70мс(N)-1 27,2 1924
2х95мс(N)-1 30,5 2518
2х120мс(N)-1 32,6 3015
2х150мс(N)-1 35,8 3659
2х185мс(N)-1 39 4434
2х240мс(N)-1 43,6 5666
3х70мс(N,PE)-1 31,6 2691
3х95мс(N,PE)-1 36 3591
3х120мс(N,PE)-1 38,6 4324
3х150мс(N,PE)-1 42,1 5214
3х185мс(N,PE)-1 46,8 6445
3х240мс(N,PE)-1 52,5 8471
4х70мс(N)-1 36 3500
4х95мс(N)-1 40,7 4645
4х120мс(N)-1 44,2 5655
4х150мс(N)-1 48,5 6879
4х185мс(N)-1 53,8 8674
4х240мс(N)-1 60,5 11135
5х70мс(N,PE)-1 39,8 4257
5х95мс(N,PE)-1 45,9 5760
5х120мс(N,PE)-1 49,4 6973
5х150мс(N,PE)-1 55,3 8816
5х185мс(N,PE)-1 60,4 10735
5х240мс(N,PE)-1 68,2 13818
3х70мс+1х35мк(N)-1 35,2 3148
3х95мс+1х50мк(N)-1 39,4 4119
3х120мс+1х70мк(N)-1 42,5 5066
3х150мс+1х70мк(N)-1 46,8 6020
3х185мс+1х95мк(N)-1 47,1 6272
3х240мс+1х120мк(N)-1 50,8 7392
3х300мс+1х150мк(N)-1 57,1 9414

₽0 for 1 м

Quantity
- + м Add to cart

SCOPE AND PURPOSE

The cables are designed for transmission and distribution of electric energy in stationary installations on alternating voltage 0,66; 1 and 3 kV, frequency 50 Hz

The cables of type VVGng(A) is used for group installation in cable lines and cable constructions and open-air electrical installations (cable overpasses, arcades).

The single-wire cables of types VBShvng(A) are used for operations in networks of DC voltage.

The class of fire hazard of the cables is according to GOST 31565 Ï1á.8.2.5.4.

STRUCTURE

Conductor

Copper single-wire or multi-wire core, of circular or sector-shaped form, of the 1 or 2 class according to GOST 22483 with the cross-section from 1.5 to 1000 mm2

Insulation

PVC-compound (color coded conductor).

Core arrangement

Insulated conductors of 2, 3, 4 and 5 core cables twisted in cable core.

Inner sheath

It is made by filling of exterior gaps between cores with the PVC-compound of low flammability.

Cable armoring

For cables of types VBShvng(A) cable armor is laid helically with two steel, galvanized tapes.

Cable sheath or jacket

PVC-compound of low flammability.

By category
Force cables
Voltage
660 / 1000 / 3000
In execution
Flame retardant (-ng(А)) / Armored
Insulation
Copper
Shell
PVC insulation
Core material
Flexible PVC
Number and nom, cross-section of CCC and screens, nxmm2, external diameter, mm, weight of 1km of cable, kg
VBShvng(A)
Number of conductors, nominal cross-section (mm2), construction, voltage (kV) Calculated diameter of cable, mm Calculated weight of cable, kg/km
2х1,5ок(N)-0,66 12,3 265
2х2,5ок(N)-0,66 13,1 305
2х4ок(N)-0,66 14,4 380
2х6ок(N)-0,66 15,4 449
2х10ок(N)-0,66 18 620
2х16ок(N)-0,66 19,8 794
2х25ок(N)-0,66 22,9 1097
2х35ок(N)-0,66 25,4 1394
2х50ок(N)-0,66 28,4 1769
3х1,5ок(N,PE)-0,66 12,7 288
3х2,5ок(N,PE)-0,66 13,5 338
3х4ок(N,PE)-0,66 15 428
3х6ок(N,PE)-0,66 16 517
3х10ок(N,PE)-0,66 18,8 728
3х16ок(N,PE)-0,66 20,7 954
3х25ок(N,PE)-0,66 24,5 1367
3х35ок(N,PE)-0,66 26,8 1726
3х50ок(N,PE)-0,66 29,9 2211
4х1,5ок(N)-0,66 12,3 324
4х2,5ок(N)-0,66 13,1 387
4х4ок(N)-0,66 14,4 497
4х6ок(N)-0,66 15,4 604
4х10ок(N)-0,66 18 869
4х16ок(N)-0,66 19,8 1156
4х25ок(N)-0,66 22,9 1687
4х35ок(N)-0,66 25,4 2130
4х50ок(N)-0,66 28,4 2744
5х1,5ок(N,PE)-0,66 14,2 365
5х2,5ок(N,PE)-0,66 15,2 442
5х4ок(N,PE)-0,66 17 574
5х6ок(N,PE)-0,66 18,5 710
5х10ок(N,PE)-0,66 21,8 1021
5х16ок(N,PE)-0,66 24,6 1394
5х25ок(N,PE)-0,66 29 2015
5х35ок(N,PE)-0,66 31,6 2565
5х50ок(N,PE)-0,66 36,2 3416
5х35мс(N,PE)-0,66 30,3 2341
5х50мс(N,PE)-0,66 34,9 3187
2х1,5ок(N)-1 13,1 292
2х2,5ок(N)-1 13,9 335
2х4ок(N)-1 15,6 431
2х6ок(N)-1 16,6 500
2х10ок(N)-1 18,4 640
2х16ок(N)-1 20,2 814
2х25ок(N)-1 23,3 1121
2х35ок(N)-1 25,8 1421
2х50ок(N)-1 28,8 1796
3х1,5ок(N,PE)-1 13,6 320
3х2,5ок(N,PE)-1 14,4 374
3х4ок(N,PE)-1 16,3 485
3х6ок(N,PE)-1 17,5 579
3х10ок(N,PE)-1 19,2 749
3х16ок(N,PE)-1 21,2 978
3х25ок(N,PE)-1 24,9 1396
VBShvng(A)
Number of conductors, nominal cross-section (mm2), construction, voltage (kV) Calculated diameter of cable, mm Calculated weight of cable, kg/km
3х35ок(N,PE)-1 27,2 1755
3х50ок(N,PE)-1 30,3 2244
4х1,5ок(N)-1 14,4 360
4х2,5ок(N)-1 15,3 425
4х4ок(N)-1 17,6 563
4х6ок(N)-1 18,8 679
4х10ок(N)-1 20,7 894
4х16ок(N)-1 22,9 1182
4х25ок(N)-1 27,2 1719
4х35ок(N)-1 29,5 2164
4х50ок(N)-1 33,1 2779
5х1,5ок(N,PE)-1 15,3 407
5х2,5ок(N,PE)-1 16,3 486
5х4ок(N,PE)-1 18,8 651
5х6ок(N,PE)-1 20,2 789
5х10ок(N,PE)-1 22,3 1054
5х16ок(N,PE)-1 25,2 1428
5х25ок(N,PE)-1 29,5 2054
5х35ок(N,PE)-1 32,2 2604
5х50ок(N,PE)-1 36,7 3399
5х35мс(N,PE)-1 30,8 2375
5х50мс(N,PE)-1 35,4 3230
1х70мк-1 19,9 1040
1х95мк-1 21,9 1337
1х120мк-1 23,3 1588
1х150мк-1 26,1 1935
1х185мк-1 28,5 2339
VBShvng(A)
Number of conductors, nominal cross-section (mm2), construction, voltage (kV) Calculated diameter of cable, mm Calculated weight of cable, kg/km
1х240мк-1 31,2 2931
1х300мк-1 34,9 3658
1х400мк-1 38,2 4530
2х70мс(N)-1 27,2 1924
2х95мс(N)-1 30,5 2518
2х120мс(N)-1 32,6 3015
2х150мс(N)-1 35,8 3659
2х185мс(N)-1 39 4434
2х240мс(N)-1 43,6 5666
3х70мс(N,PE)-1 31,6 2691
3х95мс(N,PE)-1 36 3591
3х120мс(N,PE)-1 38,6 4324
3х150мс(N,PE)-1 42,1 5214
3х185мс(N,PE)-1 46,8 6445
3х240мс(N,PE)-1 52,5 8471
4х70мс(N)-1 36 3500
4х95мс(N)-1 40,7 4645
4х120мс(N)-1 44,2 5655
4х150мс(N)-1 48,5 6879
4х185мс(N)-1 53,8 8674
4х240мс(N)-1 60,5 11135
5х70мс(N,PE)-1 39,8 4257
5х95мс(N,PE)-1 45,9 5760
5х120мс(N,PE)-1 49,4 6973
5х150мс(N,PE)-1 55,3 8816
5х185мс(N,PE)-1 60,4 10735
5х240мс(N,PE)-1 68,2 13818
3х70мс+1х35мк(N)-1 35,2 3148
3х95мс+1х50мк(N)-1 39,4 4119
3х120мс+1х70мк(N)-1 42,5 5066
3х150мс+1х70мк(N)-1 46,8 6020
3х185мс+1х95мк(N)-1 47,1 6272
3х240мс+1х120мк(N)-1 50,8 7392
3х300мс+1х150мк(N)-1 57,1 9414